D1.2 Report on the validation status of codes and models for simulation of sCO2-HeRo loop | 31/05/2020 |
D2.1 Definition of initial and boundary conditions for an SBO accident | 29/02/2020 |
D3.1 Report on identification of the regulatory elements for design of components and system | 31/05/2020 |
D3.2 Requirements for reference plant modifications for installation of sCO2-4-NPP | 30/10/2020 |
D3.3 Design bases and analyses for system and components | 31/12/2020 |
D3.4 Requirements for the pre-operational and initial start-up test programmes for the system | 30/04/2021 |
D3.5 Independent review of the sCO2-4-NPP system licensing roadmap for real nuclear power plant | 31/08/2022 |
D4.1 Test results of the improved small-scale turbomachine | 28/02/2021 |
D4.3 Conceptual design of the sCO2-4-NPP turbomachine | 31/08/2022 |
D4.4 Preliminary design and models of the sCO2-4-NPP heat exchangers | 28/02/2021 |
D4.5 Final conceptual design of the Heat Sink Exchanger | 31/08/2022 |
D4.6 Final conceptual design of the Heat Recovery Exchanger | 31/08/2022 |
D4.7 Qualification methodology for Heat Exchanger and turbomachinery according to NPP requirements | 30/06/2022 |
D5.1 Design concept with auxiliary systems | 31/10/2021 |
D5.3 Summary of modifications on the reference plant after integration of the heat recovery system | 28/02/2022 |
D5.4 Thermodynamic performance of the heat recovery system integrated into the plant | 31/08/2021 |
D5.6 Fast running version of the sCO2 heat removal system for implementation in control logic of PWR simulator | 31/10/2021 |
D6.2 sCO2 System integrated in PWR-simulator | 31/01/2022 |
D6.3 Representative transients of a European PWR equipped with sCO2-system monitored and assessed | 31/08/2022 |
D7.1 First version of sCO2-4-NPP exploitation plan | 28/02/2021 |
D7.2 sCO2-4-NPP exploitation plan | 31/08/2022 |
D8.3 Project public website | 29/02/2020 |
D8.4 End-user workshop | 31/08/2021 |
D8.5 sCO2-4-NPP symposium | 30/07/2022 |